How do you keep security and housekeeping posts filled during Diwali, Chhath and Sankranti leave? Ask your FM vendor for a festival leave plan three weeks ahead: who is going on leave, a named reliever for every critical post, and an agreed replacement time. Then check deployment against contracted posts every shift, night shift first, with attendance proof.

Festival leave is legitimate. Guards and housekeeping staff should be able to celebrate with their families while offices, plants, warehouses and hospitals in Hyderabad, Bangalore and Chennai keep running safely. The answer is not to refuse leave. It is to plan cover early and check that it works.

Why festival weeks are different

In a festival week, many people ask for the same dates, and the relievers want leave too. If the vendor looks for a replacement only after someone fails to report, the post stays empty.

The 2026-27 calendar shows two waves. Diwali falls on Sunday, 8 November 2026, and Chhath follows in mid-November, so many workers from Bihar, Jharkhand and eastern Uttar Pradesh take one long trip home for both. Makar Sankranti on 14 January 2027 and Pongal on 15 January bring a second wave, this time from local staff across Telangana, Karnataka and Tamil Nadu. Confirm the exact Chhath observance days with your staff before you finalise the leave list.

Replacement is also slower than it used to be. In March 2026 The Economic Times reported that average vacancy duration in major metros had risen from 5-9 days to 12-20 days during a period of mass home travel. Recruiting after the leave starts is too late.

Critical posts first

Start with the posts where one empty shift creates a safety or business risk.

  • Night security. Main gate, perimeter rounds, CCTV room and stores. Festival nights bring crackers and more visitors just when staff numbers fall.
  • Hospital wards. Housekeeping in ICUs, operation theatres, wards and biomedical waste handling. Match the reliever to the duties and infection-control training, and keep housekeeping separate from clinical work.
  • Plant and warehouse gates. Gate passes, vehicle and material checks. A worker waiting outside the gate without a pass or induction is not cover.
  • Offices and campuses. Access control, washrooms and pantry often continue when the office is closed. Reduce services only with written approval.

Make a simple list of every contracted post and mark it Critical, Important or Flexible. Critical posts need a named reliever before anyone’s leave is approved.

The reliever pool

Buffer size. The same Economic Times report described a large FM provider holding a 5-6% staffing buffer at critical client sites. Treat that as a starting reference, not a rule. Size your pool from the actual leave list: count the approved leave days on each critical post, allow for people who go on leave at the same time, and keep a cleared standby for late returns.

Cross-training, within limits. An office-floor housekeeper may not know the ward protocol, and a housekeeper must never cover a security post. Ask for relievers trained for your type of site, preferably your site itself.

Induction before the festival. Every reliever should do at least one shadow shift before festival week. At plants and warehouses, gate passes and safety induction should be complete before the leave starts.

For security, there is a legal side too. Under the Private Security Agencies (Regulation) Act, a person can be engaged as a private security guard only after the agency is satisfied about their character and antecedents and they have completed the prescribed training. Telangana’s rules set entry-level training at 100 classroom hours plus 60 field hours over at least 20 working days, with a shorter course for ex-servicemen and former police. Tamil Nadu’s rules require antecedent checks before a guard is engaged. There is no festival exemption, so a guard hired the week before Diwali is not a ready reliever. Approve a named, eligible guard, not a promise to “send someone”.

Workers on festival duty also have rights. The Telangana Factories and Establishments (National, Festival and Other Holidays) Act gives 8 paid holidays a year, while the Telangana Shops and Establishments Act gives 9. The Tamil Nadu Industrial Establishments (National, Festival and Special Holidays) Act gives 9. Check the applicable list for each site. Under the Telangana and Tamil Nadu holiday Acts, a worker who works on one of their holidays chooses between twice the wages, or normal wages plus a paid substitute holiday within three days of the holiday. The Karnataka Industrial Establishments (National and Festival Holidays) Act gives the same choice, with the substitute on another day. The Occupational Safety, Health and Working Conditions Code came into force in November 2025, but it does not cancel these state holiday Acts. Your vendor should budget for holiday pay, give written notice, and never pressure staff to cancel approved leave.

Replacement time in the SLA

Write the replacement time into the SLA, with a separate line for festival weeks. Critical posts should get the same or a tighter target, because the vendor has had three weeks’ notice. A starting point for discussion:

  • Critical (night gate, ICU housekeeping, plant gate): a named reliever already rostered, and a fast target for a no-show.
  • Important (day reception, common areas): the same target as a normal week.
  • Flexible (second housekeeper, low-use floors): can be merged or paused with written approval.

Agree your own numbers. Also agree what happens when a target is missed: a deduction for the unfilled shift, or a credit on the next invoice. Clear terms mean no argument on Diwali night.

Proof of deployment

A plan on paper is not enough. You need proof, every shift, that the contracted posts are filled by the right people.

Shift-wise headcount against contract. Ask for a report for each shift: contracted posts, posts filled, reliever names, and any gap with the time it was closed. Read the night shift first.

Record the person who actually worked. The deployment record should show the reliever’s name, employer, post, actual in and out times, and holiday work. Never leave the absent worker’s name against a filled post. If a reliever leaves mid-shift, the record should show it, along with the handover and the standby called. Where the contract labour provisions apply to your site, you as principal employer can end up liable if the contractor short-pays wages, so match attendance to the wage records as well as the invoice.

Attendance app, not only a register. A paper register can be filled in later. A digital attendance app with geofenced, photo-based check-in shows who reached the site and when. Ask to see reliever check-ins the same day.

Night checks. Ask the vendor’s supervisor to do surprise night rounds during festival weeks, with time-stamped photos of each critical post.

Questions to ask your FM vendor this week

  • Who on my site has applied for leave for Diwali, Chhath and Sankranti, and for which dates?
  • Who is the named reliever for each critical post, and have they done a shadow shift here?
  • Are all relief guards trained and verified as the security agency rules require, and can you show the records?
  • How many extra people are you holding for late returns and no-shows?
  • What is the replacement time for a no-show on a festival night, and who do I call?
  • Will I get a shift-wise headcount against contract every day, with attendance app check-ins?
  • Who will do night checks during festival weeks, and will I see the photos?
  • How are relievers who work on festival holidays being paid?

If your vendor answers all eight clearly, your posts are in good hands. If not, it is better to know now than on Diwali night.

Want a second look before the festival rush? Request a Site Survey and our team will map your posts, rank the critical ones and build a festival reliever plan for your site.